Create CMMS Asset Records with Ease

Create CMMS Asset Records the Easy Way

Building a CMMS asset database can feel overwhelming. In fact, it can feel so overwhelming, some organizations give up before they even try. But it doesn’t have to be that way. Dividing up a big job into smaller chunks makes it easier. Use these five steps to create your CMMS asset records with ease.

Step 1: Pick 10-20 of your most important assets.

Make a list of 10-20 of your organization’s key assets. Start with the assets your maintenance team works on most; assets essential to production or operations; and any that are prone to emergency breakdowns.

Step 2: Decide your maintenance strategy for each asset.

[related-content]

Maintenance can be triggered in different ways: use-based maintenance, fail-based maintenance, or condition-based maintenance. Pick one strategy for each asset.

  1. Use-based maintenance (UBM) is triggered by time, meter, or event—such as changing the oil every 3,000 miles or every 3 months.
  2. Fail-based maintenance (FBM) is running an asset to failure. A simple example would be replacing a burned-out lightbulb.
  3. Condition-based maintenance (CBM) is triggered when an asset’s condition changes outside of a specified range based on data, which can be gathered manually or automatically.

Step 3: Create a schedule.

Once you have determined each asset’s maintenance policy, you can use your CMMS software to build schedules for each asset.

  • For assets on a UBM policy, you’ll build a work plan and schedule maintenance tasks based on the factors you’ve chosen.
  • For CBM, you’ll create a range of conditions that will form the basis of a work plan and schedule, as well as forecast when CBM will likely occur.
  • Last, but not least, while it’s hard to plan for FBM, you can forecast when failure is likely to happen and ensure you’re ready to react, with the right parts in stock and repair procedures in place.

Step 4: Identify the data you need.

Next, you’ll decide what data you need to capture to support your plans. Some may be available in your archives, but much of it will need to be collected from this point forward. And that’s okay.

Step 5: Repeat with another 10-20 assets.

Once you’re done with the first 10-20 assets, pick another group and work through the same steps.

Take the extra time to get it right the first time, and you’ll have a solid foundation of good CMMS data that will make your maintenance operations run more smoothly. You’ll be creating CMMS asset records with ease in no time!

Need help? Call us. We’re here for you.

Popular Categories

Latest Post

Contractor authorization checked at facility entrance

Facility Managers: Enforce NIST RBAC and OSHA Permits in CMMS

Technician reviewing oil sample for maintenance

Technicians: Trigger Work Orders Now With Oil Analysis Maintenance

Analyst comparing maintenance work-order data

6 Step Data Standardization for Maintenance Teams to Fix MTBF and MTTR

Engineer securing access to integration infrastructure

Faster CMMS API Integration: Checklist & NIST for Maintenance Teams

Related Posts

Compliance-first CMMS steps for facility managers: map NIST RBAC to contractor roles, link OSHA permit records to your PACS, and run a live permit.....
Guide for technicians to standardize sampling, set a 3–6 baseline, and link lab tests to CMMS work orders and KPIs you can act on today...
Practitioner first playbook to turn messy CMMS records into trusted KPIs, with a minimal data model, a 6 step roadmap, and EDA, NLP fixes...

Can't Find What Your Looking For?

Our team of experts is happy to assist with finding the maintenance management software resources you’re looking for!